PR predicted Predicted performance ratio(decimal)
Yf predicted Predicted final system yield from simulation software (kWh/kW) or (kWh/kWp), also can said the unit is hour
PSHi predicted Predicted Peak sun hour, hours when solar irradiance at 1000 W/m² (1 kW/m²), which is considered "full sun" (hour)
From Step 2 Peak Sun Hour >> 2.1 Predicted plane-of-array PSH per annum, PSHi predicted = 1688h
From Step 6 Final System Yield >> 6.1 Predicted Final System Yield, Yf predicted = 1278 kWh/kW per annum = 1278 h
PR predicted = 1278/1688 = 0.7571
PR expected Expected performance ratio(decimal)
Yf expected Expected final system yield from mathematical formula (kWh/kW) or (kWh/kWp), also can said the unit is hour
PSHi measured Measured Peak sun hour, hours when solar irradiance at 1000 W/m² (1 kW/m²), which is considered "full sun" (hour)
From Step 2 Peak Sun Hour >> 2.2 Measured plane-of-array PSH per annum, PSHi measured = 1666.6667h
From Step 6 Final System Yield >> 6.2 Expected Final System Yield, Yf expected = 1316.179 kWh/kW per annum = 1316.179 h
PR expected = 1316.179/1666.6667 = 0.7897
PR measured Measured performance ratio(decimal)
Yf measured Measured final system yield from measurement (kWh/kW) or (kWh/kWp), also can said the unit is hour
PSHi measured Measured Peak sun hour, hours when solar irradiance at 1000 W/m² (1 kW/m²), which is considered "full sun" (hour)
According to SEDA, PR measured is accepted if PR measured > 0.75.
From Step 2 Peak Sun Hour >> 2.2 Measured plane-of-array PSH per annum, PSHi measured = 1666.6667h
From Step 6 Final System Yield >> 6.3 Measured Final System Yield, Yf measured = 1333.3 kWh/kW per annum = 1333.3 h
PR expected = 1333.3 /1666.6667 = 0.8
According to SEDA, PR measured is accepted if PR measured > 0.75, so PR expected = 0.8 is accepted.
Design And Sizing of Grid-Connected Photovoltaic Power System - SEDA Malaysia- 4th Published 2023
Example 7.4
SEDA GCPV Tutorial Design - Nov 2024
3. System performance and evaluation - Question 3