Pmax STC = 200W
No power clipping (which means number of PV modules can be large)
Pout max = 75% of average monthly maximum demand (MD) of power
75% is set by authority
It's the differences to Energy Hub - Step 6 AC Power Constraint
Pout max Maximum allowable AC power limit injected into the gird by the authority (W)
f1 DC/AC ratio. Typically, 1.11, refer to Step 1 Choose Inverter (decimal)
Nt ac pwr Total number of PV modules based on AC power limit (units)
Pmax STC Peak power of PV module at STC (W)
Pout max = Average Monthly Maximum Demand (MD) Of Power * 75% = 76.52 * 75% = 57.39 kW
318 units of PV modules can be installed within maximum demand constraints
Design And Sizing of Grid-Connected Photovoltaic Power System - SEDA Malaysia- 4th Published 2023
Example 3.8
SEDA GCPV Tutorial Design - Nov 2024
1. Dimensioning of PV array - Question 9