X% = 60%
PF = 0.85
VL = 400V
No power clipping
Pmax STC = 200W
f1 = 1.1
From the schematic diagram below, CT = 200 A
Pout max CT Maximum AC power limit based on CT or fuse rating (W)
x% Maximum percentage of the allowable limit. Typically, 60% for Malaysia. (decimal)
Calculate in decimal. Exp:
300A/5A = 60% (Pass, 0.6)
200A/5A = 40% (Fail)
150A/5A = 30% (Fail)
For Low Voltage Consumers, not exceeding 60% of fuse rating (for direct meter) or 60% of the current transformer (CT) rating of the metering current transformers.
CT Current transformer or fuse rating (A), exp:
150/5 A, CT = 150 A
200/5 A, CT = 200 A
300/5 A, CT = 300 A
VL Nominal line voltage (V)
Assume = 400 V if not given
PF Power factor, typically 0.85 for Malaysia (decimal)
For customers taking supply at 33 kV or below, the value of the power factor to be maintained is ≥ 0.85. Power factor < 0.85 will result in power factor surcharge.
Reference: Power Factor - Tenaga Nasional Berhad
Pout max CT = √3 * 0.6 * 200 * 400 *0.85 =70.67kW
Pout max Maximum allowable AC power limit injected into the gird by the authority (W)
f1 DC/AC ratio. Typically, 1.11, refer to Step 1 Choose Inverter (decimal)
Nt ac curr Total number of PV modules based on AC Current Constraint (units)
Pmax STC Peak power of PV module at STC (W)
392 units of PV modules can be installed.
Using an external controller or popularly known as power management controller.
This setup can also be used to adjust the plant's PF.
All settings can be done at the power management controller.
Design And Sizing of Grid-Connected Photovoltaic Power System - SEDA Malaysia- 4th Published 2023
Example 3.9
SEDA GCPV Tutorial Design - Nov 2024
1. Dimensioning of PV array - Question 10