Step 2 -- SOLARMAN 200W
Select lowest number from Step 2-7.
In reality, sometimes is impossible fulfilled all constraints.
Satisfy the regulatory bodies constraints is priority.
Step 2 -- Portrait orientation, maximum number of PV modules, Nt architecture = 22
Step 3 -- Minimum Number of PV modules can be installed based on customer's energy consumption, Nt_ene = 22
Step 4 -- Maximum Number of PV modules can be installed based on customer's budget, Nt bud = 23
Step 5 -- Maximum Number of PV modules can be installed based on AC constraints (f1 =1.1), Nt ac pwr = 22
Step 6 -- Maximum Number of PV modules can be installed based on maximum demand constraint, Nt ac pwr (MD) = 318
Step 7 -- Maximum Number of PV modules can be installed based on AC Current Constraint, Nt ac curr = 392
The number of PV modules, Nt is 22, portrait orientation.
Design And Sizing of Grid-Connected Photovoltaic Power System - SEDA Malaysia- 4th Published 2023
Example 3.10
SEDA GCPV Tutorial Design - Nov 2024
1. Dimensioning of PV array - Question 11